Canon Hussey and Arthur Millwood

Salix Homes

Case study
Scroll Down

Project overview

Cannon Hussy and Arthur Millwood are tower block which stand side by side in Manchester City Centre. Salix Homes directly awarded us the refurbishment of which included:

 

Cannon Hussey

We were instructed to replace the existing external cladding panels with a superior rated product for fire compliance. Internally, we are installing a new sprinkler system to cover all internal flat areas.

Additional works included:

  • Paint external railings
  • Repair and replace firebreaks
  • Remove and recoat balconies
  • External boundary fencing renewal
  • Fire sprinklers installation

Arthur Millwood

The works on Arthur Millwood have been similar to those on Cannon Hussey with the removing of existing cladding panels. We have stripped back the fabric to install a new cladding support system and new Alucobond A2 rated panelling. Internally, we are installing a new sprinkler system to cover all internal flat areas.

Additional works included:

  • Fire sprinklers installation
  • New roofing installation
  • New window installations
  • Flat entrance doors to each property
  • Paint external railings
  • Repair and replace firebreaks
  • Remove and recoat balconies
  • External boundary fencing renewal

click to enlarge

Programme Management

As a partner contractor for Salix high rise works, we were involved in the project from an early stage, providing programme durations and budget costs to support their funding application for the Ground Source Heat Pumps. Therefore, our approach to programme management was robust and well developed. As a result of this and our monthly progress meetings held with the client, we were able to meet our agreed milestone dates.

Managing specialist work packages

Liaison with M & E and Communications bodies regarding temporary and permanent relocation of plant and equipment on roof of both blocks.

Build a safer future charter

This scheme was procured as a direct result of the Grenfell tragedy due to similar cladding materials present. We worked collaboratively with Salix, and together we were early adopters that assisted the implementation of the development of the ‘Building a Safer Future’ Charter.

Go back to case studies

Case studies

View next case study

Next case study

Speak with an expert

Contact us

'